Show Sitemap

Aerospace Group

TSS is equipped to meet the highest standards for service, products and delivery. The proof is in our longstanding association with companies fulfilling government contracts for new make, prototype and production aircraft engine components and power systems for defense and private sector builders.

Our experience with complex machining processes gives TSS customers the flexibility of having even the most difficult projects performed under one roof. The diverse manufacturing capabilities offered at TSS eliminates the need for customers to use several specialty facilities. Reducing the handling of parts being shipped from company to company saves shipping costs, decreases the opportunity of a part being damaged during loading and unloading, and gives the customer a single point of contact to check on the part’s progress.

When working with high-level defense and private sector contractors, you don’t succeed without the complete confidence of your customers. For TSS, that confidence is reflected in our 100% quality ratings from General Electric Aircraft Engines (GEAC), Defense Supply Center Richmond (DSCR), Defense Supply Center Philadelphia (DCSP) and Defense Supply Center Columbus (DSCC).

Equipped to meet stringent quality, delivery and price demands, TSS is where companies turn with their most complex machining projects. Excellent project communications, process flexibility and a commitment to acquiring state-of-the-art technology have earned the respect and continued business of some of the nation’s most demanding customers.

View our equipment showcase

Key Features:

Success Stories

B2 Stealth Bomber

Situation

  • Swing clamp failure caused stand down of all B2 Stealth Bombers
  • National Defense identified this as a top priority of the Pentagon

Challenges

  • Extremely quick turnaround time required
  • Numerous design modifications
  • Complex machining operations to exotic material

Solution

  • Work hand-in-hand with the parts design engineers to manufacture the replacement part

Result

  • Unified effort from the entire division resulted in successful repair that returned the Stealth Bomber to the air according to schedule